Start adding projects. Assign at least €0 to the projects you want and vote according to your preferences to define the budget.
Maximum budget exceeded
This project exceeds the maximum budget and cannot be added. If you want, you can delete a project you have already selected, in order to be able to vote again according to your preferences.
Confirm vote
Projects
These are the projects you have chosen to be part of the budget.
Projects
The performance includes:
Elimination of intermediate step on the sidewalk of pg. Pins with the riera de la Salut (bridge area), at the exit of the Pl. Can Llobera
Arrangement of water bases in c/ Constitució with pg. Onze de Setembre
Location: Pg. Pins, at the height of the Riera de la Salut bridge
Neighborhood: Can Llobera
-
04/03/2019 16:19
They were added to this budget
-
10/06/2025 06:45
The proposal Arrenjament de les bases que es formen al Carrer Constitucio amb el passeig 11 de setembre quan plou was created
-
10/06/2025 06:45
The proposal Eliminació perillós graó no visible anant des de la residència Can Llobera cap a la Riera de la Salut davant del pont de pedra was created
Share