Projects

Actions to improve the safety of sidewalks and drainage at the intersection between pg. Pins and the c/ Constitució, in the area of the railroad bridge

The performance includes:

  1. Elimination of intermediate step on the sidewalk of pg. Pins with the riera de la Salut (bridge area), at the exit of the Pl. Can Llobera

  2. Arrangement of water bases in c/ Constitució with pg. Onze de Setembre

Location: Pg. Pins, at the height of the Riera de la Salut bridge

Neighborhood: Can Llobera

Comment